Direct Line 24-HR Emergency Response

Direct Line: 1-226-213-4707  |  24-Hour Emergency Response Line: 1-844-274-3535

Heavy-duty Algonquin detour bridge reaches 67.5 m over QC river

Heavy-duty Algonquin detour bridge reaches 67.5 m over QC river

When the Ministère des Transports Quebec (MTQ) required a temporary detour solution for their bridge replacement project on Autoroute 40, near Berthierville, a Heavy-Duty Algonquin Modular Panel Bridge System filled the gap. Cantilevered launch from one side without...
NBDTI installs Algonquin bridge replacement with its own crews

NBDTI installs Algonquin bridge replacement with its own crews

The New Brunswick Department of Transportation and Infrastructure (NBDTI) recently installed one of our popular Algonquin Modular Panel Bridge Systems using its own district crews instead of a contractor. The new bridge is a permanent replacement for a failed wooden...