A small Algonquin Prefabricated Girder Bridge that rejoined two sides of a tiny harbour has made a great big difference to locals in the township of Portugal Cove – St. Phillip’s. Without a Spurrell’s Road Bridge for over a year, the St. Phillip’s waterfront had, effectively, been cut in half, requiring motorists to take an inland route to get across to the other side.

The bridge had been declared unsafe and was closed in April of 2016. Once things worked through the proper planning and tendering channels, Algonquin Bridge was awarded the contract to design and supply its replacement. It was delivered to the site on a single flatbed trailer and installed in just one day.

Skewed design needed to fit into existing abutments
The new bridge was manufactured with skewed ends to accommodate the angle of the existing roadway/abutments. We worked closely with the project team to have a good transition from the abutments to the deck surface and the assembly/placement went very well. A factory-installed, timber wearing surface allowed for a minimum amount of joints.

 stream crossing, prefabricated bridge, municipal bridge replacement, prefabricated stream crossing

Galvanized finish ideal for coastal region
Being so close to the coastline, galvanizing was a real benefit for these bridges. We custom-designed the span in sections so it could still fit in the galvanizing tank. The resulting design innovations also saved fabrication time and allowed for more efficient shipping.

stream crossing, prefabricated bridge, municipal bridge replacement, prefabricated stream crossing

The new bridge was officially opened in May of 2017 with a ribbon-cutting ceremony: (L-R) Mike Sparrow of Pyramid Construction, Deputy Mayor Gavin Will, Mayor Moses Tucker and Rick Appleby of EXP Services.

Project at a glance:
Project Name: Spurrell’s Road Bridge
Location: Portugal Cove, Newfoundland and Labrador
Owner: Government of Newfoundland and Labrador
Engineer: EXP Services
Contractor: Pyramid Construction
Product: Prefabricated Girder Bridge
Application: Stream Crossing for Municipal Road
Dimensions: Length 11 m, Width 7 m
Installation time: One day