Taking action on our Sustainability Policy

Committed to a better future

Sustainability is integral to our business. Plus it’s the right thing to do.

View The AIL Group Sustainability Policy

Download our Taking Action on Sustainability Brochure

Bolt-A-Plate culvert stream crossing with MSE Wire Wall Headwalls

Making a Healthier Planet

The AIL Group is committed to achieving net zero emissions by 2050 and being a market leader in low-carbon solutions that support biodiversity.

  • We have a “Net Zero by 2050” target. We measure key parts of our Scope 1, 2 and 3 emissions, and have set interim milestone emission targets.
  • We have added on-site solar generation, improved building envelope energy efficiency and are working with our supply-chain partners and customers to lower carbon footprints.
  • Offering low-carbon footprint solutions which are supported by third-party-reviewed environmental product declarations and life cycle assessments.
  • Utilizing a high amount of reusable and recyclable materials.
  • Understanding and improving life-cycle costs.
  • Reducing negative biodiversity impacts during construction and service, and regenerating the environment, where possible.
AIL and ALG buildings with solar panels and EV charging stations
Over 1,000 solar panels and counting: Our on-site renewable energy production decreases our reliance on the power grid.
Naturally weathering steel finish on prefabricated pedestrian bridge
Recycled steel with naturally weathering finish: Steel bridges offer a lower carbon footprint than concrete beam bridges. With a naturally weathering finish, no oil-based coating is used. This reduces toxic emissions of volatile organic compounds. Plus, not having to do periodic paint maintenance protects habitats from contaminated blast debris.
Maybe detour bridge stream crossing
Supporting flood mitigation: Rental detour bridge part of Highway 97 flood mitigation strategy in Northeastern BC. View project profile >>
Ultra-Cor overpass with MSE walls
Low-carbon solutions: This Ultra-Cor overpass near St. John’s, NL, has a lower life-cycle carbon footprint compared to a concrete beam bridge solution. View project profile>>
Ultra-Cor Bow Valley Gap Overpass
Supporting wildlife connectivity: The Bow Valley Gap Wildlife Overpass is expected to increase wildlife connectivity in the Yellowstone-to-Yukon corridor and dramatically reduce wildlife-vehicle collisions. View project profile>>
GRS Bridge stream crossing replaces culverts
Restoring fish passages: An AIL Geotextile Reinforced Soil (GRS) Bridge replaces suspended culverts and restores fish passage on an Alberta creek.  View project profile>>

 


 

Algonquin Modular Bridge System Stream Crossing
Permanent or temporary bridges: Algonquin Modular Bridge System installed in time for NB school year. View project profile >>

Connecting Communities

We take a leadership role in keeping communities connected with easy-to-install, resilient solutions that will serve for many decades.

  • Providing solutions that are easy to install with local crews and lighter-weight equipment.
  • Offering accelerated bridge construction solutions that reduce traffic disruption.
  • Optimizing the use of local materials.
  • Designing low-maintenance infrastructure solutions.
  • Designing solutions to increase user safety.
Artist rendering of Climate change resilience of Buried Metal Bridges and Prefabricated Bridges
Resilience to climate change: Offering extreme-event features to reduce climate change flood and debris risks such as larger spans, geotextile reinforced backfill, scour protection, greater vertical clearances and more.
Excavators lift prefabricated bridge section into place
Limited road closures: Our prefabricated bridges install easily and quickly with local crews and equipment, reducing road closure times.
Rapid response emergency culverts replacement
Emergency solution: This large replacement culvert was manufactured and delivered within 24 hours to replace a Cape Breton washout. View project profile>>
Bailey-Bridge-style emergency replacement bridge
Emergency solution: This replacement bridge was delivered to a remote site in Nova Scotia within five days of order. View project profile>>

 


 

Gardener watering tomato plant in community garden with other volunteers
Investing in Employees & Communities

We have progressive programs in place in support of both our employees and our communities.

  • Creating a culture of diversity, equity and inclusion.
  • Promoting a culture where everyone returns home safe and healthy.
  • Offering integrated health and wellness initiatives.
  • Our Family Education Grants support our employees’ next generation.
  • Recognizing potential and investing in our employees.

Progressive Programs

Students with textbooks learning robotics
Engaging with education: We do this through scholarships, co-op placements, grad students, research projects and more.
teens engaged in community service picking up trash
Supporting our communities: We are proud to support our local communities in a variety of ways.

The AIL Group of Companies