March 4, 2015
The New Brunswick Department of Transportation and Infrastructure (NBDTI) recently installed one of our popular Algonquin Modular Panel Bridge Systems using its own district crews instead of a contractor. The new bridge is a permanent replacement for a failed wooden Howe Truss bridge on Route 550 near Centreville in Carleton County.
The Algonquin Modular Panel Bridge — our best-selling option
The Algonquin Modular Panel Bridge is one of the most popular prefabricated steel panel bridge systems in the world, with:
- 3 m pinned truss panels
- Clear spans of up to 61 m in increments of 3 m
- Standard roadway widths of 3.15 m, 4.2 m and 7.35 m
- Internal and cantilevered footwalks
- Configurable for vehicular, pedestrian or utility support uses