Innovative, economical solutions for heavy-duty applications
Algonquin T1000 Modular Bolted Truss Bridge Systems are innovative and economical bridging solutions for heavy-duty applications.
Algonquin T1000 Modular Bolted Truss Bridges use 9 m (30′) long prefabricated truss sections that are bolted to the top and bottom chord members to form pre-cambered side trusses that carry the applied loads and counter dead load deflection.
Designs can be configured for a wide range of roadway widths up to three lanes. Driving surfaces can be steel deck panels with an epoxy aggregate anti-skid coating, asphalt-ready steel decking or timber.
Whatever your requirements, Algonquin T1000 Bridges are resilient, sustainable and dependable bridging solutions.
BROCHURES & VIDEOS
-
Algonquin Bridge Connecting Communities Brochure
Learn more about accelerated bridge construction options in this 20-page brochure outlining the full range of Algonquin’s made-in-Canada solutions like: Modular Panel Bridge Systems, Custom Prefabricated Girder Bridges and Pedestrian/Trail Bridges and Bridge/Abutment Packages.
Download(5.43 MB)
-
Kelowna Airport T1000 Bridge, Kelowna, BC
Have a look at this Algonquin T1000 Bolted Bowstring Truss Bridge that was designed to be disassembled and redeployed as the airport grows.
-
Algonquin T1000 Modular Bolted Truss Bridge, Weymouth, NS
The Gates Lane replacement bridge cantilever launched 64 m across the Sissiboo River to reconnect the community after its century-old predecessor was closed in January of 2024. This is our second T1000 bridge in Nova Scotia.
-
Algonquin T1000 Modular Bolted Truss Bridge, Mira Gut, NS
Take a 360° drone-video tour of this Canadian-made Algonquin T1000 Modular Bolted Truss Bridge through all three phases of the 2022 project: assembly, cantilever launch and completion. This 84 m span features an 8.4 m two-lane roadway, a 1.5 m exterior footwalk and a galvanized finish for extended life in this coastal application.
-
Algonquin Modular Bolted Truss Bridge, Durham, NB
Take a 360° video tour of this heavy-duty 79 m Algonquin Modular Bolted Truss Bridge across the Nashwaak River.
-
Modular Bridge Cantilevered Launch, Berthierville, QC
The launch was executed from one side using a fully cantilevered sequence with a 10-bay launch nose. When all was ready, on-site equipment nudged the structure across the river to the opposite side.

