• August 12th, 2024

Algonquin Modular Bridge System, Quick, BC

Take a video tour of this 93.6 m replacement bridge over the Bulkley River in Quick, BC. The two spans were cantilever launched from each side to meet at the existing centre pier. We also designed and supplied custom approach ramps and a prefabricated pedestal bearing system.

The AIL Group of Companies